As usual, here is a summary of the most relevant works carried out:
1.- The works during the month of May have been aimed in great deal towards the cleaning of green areas to fulfill the fire-prevention plan.
2.- We have finished a section of pavement in calle Cipreses.
3.- We have repaired the path of the Calahonda park pathway and cleared the scrub.
4.- Calle Encinas, cleaning of the non-authorised garden rubbish deposit point, notification to the Town Hall and placement of notice.
5.- Cleaning of the cul-de-sac at the end of calle Triana and repair of the garden rubbish deposit.
6.- Starting of the works in calle Sevilla for building a pavement and this way also remove aerial cables.