Works in September 2021

During the month of the September, these are the most relevant works carried out:

1.- Cleaning of green area by Balcón de Tenis.

2.- Repair works on noisy manhole covers in the streets.

3.- Cutting back plants that were blocking the lampposts lights.

4.- Building a new bridge at the Parque de Calahonda

5.- Installation of informative radar on Avda. de España.